Hero

SureFit

SureFit System Patent# 7,275,349 and 7,841,154


SureFit columns by a balcony

Seamless split columns

These reassembled SureFit columns are seamless and were assembled without the use of bondo.
Sure Fit Installation -
View as Slideshow

Or click on a picture for a larger view

Note: for detailed instructions click here

SureFit Installation - Marking area

Marking Area

SureFit Installation - Removing the screws


Removing the Screws

SureFit Installation - The SureFit flange can be seen


The SureFit flange can be seen

SureFit Installation - Mark width of existing lolly column


Mark width of existing lolly column

SureFit Installation - Cut out piece of flashing for existing lolly column


Cut out piece of flashing for existing lolly column

SureFit Installation - Remove paper and plastic from flange

Remove paper and plastic from flange

SureFit Installation - Check for fit


Check for fit

SureFit Installation - Apply construction grade adhesive


Apply construction grade adhesive

SureFit Installation - Snap pieces together


Snap pieces together

SureFit Installation - Replace screws


Replace screws
SureFit Installation - Clean up with a little acetone


Clean up with a little acetone

SureFit Installation - Apply more adhesive for use in the flashing


Apply more adhesive for use in the flashing

SureFit Installation - Put glued piece in place in flashing


Put glued piece in place in flashing
SureFit Installation - Screw in place


Screw in place
SureFit Installation - Wait for adhesive to dry


Wait for adhesive to dry